$2,565.00
Add two toilet facilities to a worksite or temporary venue with this portable double toilet building from Machinery Store. Its insulated steel construction, easy-clean surfaces and integrated ventilation support practical everyday use.
Description
Add two toilet facilities to a worksite or temporary venue with this portable double toilet building from Machinery Store. Its insulated steel construction, easy-clean surfaces and integrated ventilation support practical everyday use.
Detailed Specifications
| Construction | Steel-framed, shipping-container-style structure with insulated walls and roof; sealed protective steel-sheet roofing. |
|---|---|
| Wind rating | N3, as stated in the source specification. |
| Handling | Four corner lifting lugs and forklift pockets for transport and positioning. |
| Interior finish | Easy-clean floor, walls and ceiling. |
| Door | Vented, key-lockable door in a steel frame. |
| Electrical standards listed | AS 3000; Electrical Certificate of Test referencing Electrical Safety Regulation 2013. |
| Water-efficiency standards listed | WELS and WaterMark; AS/NZS 6400:2016. |
| Optional structural documentation | Detailed plans for council submission and Form 15 with N3 wind-rating compliance are listed as additional-cost options. Engineer footing design is available; footing certification is by others. |
| Layout | Double toilet building with handwashing facilities; suitable for standalone positioning or connection beside an existing building. |
| Fixtures | Toilet roll holders, toilet brush with wall-mounted holder, rear vents and fans. |
| Electrical installation | External IP66 distribution board with one 2-pole 10 A RCD and test facility; exhaust fan, ceiling light and light switch. |
| Toilet water rating | WELS 4 Star; 4.5 L full flush, 3.1 L half flush, 3.4 L average; registration L07047. |
| Basin tap water rating | WELS 5 Star; 6.0 L/min; registration T38665. |
Installation and Connections
Connect the building to suitable mains power, water and sewerage for portable or permanent use. Final electrical, water and drainage connections are completed by the site installers; the installing plumber supplies Form 7. The standards and certificates listed above are Australian references. Confirm the supplied documents and requirements for your installation location.

Reviews
There are no reviews yet.